BMS-Parallel Box G2
This BMS is ideal for use with the X1 and X3 Hybrid Inverters. It allows you to double the storage capacity with T30 & T58 batteries.
Features
- Increase the capacity of ESS
- Extend the working hours of ESS
- Dual-module in case
- Prolong the batteries life due to the alternate use of dual-module
- IP55
T58
- X1 – Single Phase: 2, 4 or 6 Triple Power 5.8kWh batteries. Requires Master (HV-T-BAT-H-58-MASTER-V2 )
- X3 – Three Phase: 4, 6, 8 Triple Power 5.8kWh batteries. Requires Master (HV-T-BAT-H-58-MASTER-V2 )
T30
- X1 – Single Phase: 2, 4 or 6 Triple Power 3.0kWh batteries. Requires BMS (MC0600 & HV10230)
- X3 – Three Phase: 4, 6, 8 Triple Power 3.0kWh batteries. Requires BMS (MC0600 & HV10230)
For further configuration information please refer to the installation manual
BMS Parallel Box II G2 Installation Video
Please note:
- Unlike G1 version of BMS-Parallel Box this G2 now requires T58 Master battery, meaning it is easier to retro-fit to existing systems
- A minimum of 2 batteries (single phase) and 4 batteries (three-phase) must be used with this product.