Welcome to Powerland Renewables!
Register for a Trade Account

SOLAX BMS Parallel Box G2

Description

Part No: SOLAX-BMS-PB-G2 Storage Systems - Accessory

    BMS-Parallel Box G2

    This BMS is ideal for use with the X1 and X3 Hybrid Inverters. It allows you to double the storage capacity with T30 & T58 batteries.

    Features 

    • Increase the capacity of ESS
    • Extend the working hours of ESS
    • Dual-module in case
    • Prolong the batteries life due to the alternate use of dual-module
    • IP55

    T58

    • X1 – Single Phase: 2, 4 or 6 Triple Power 5.8kWh batteries. Requires Master (HV-T-BAT-H-58-MASTER-V2 )
    • X3 – Three Phase: 4, 6, 8 Triple Power 5.8kWh batteries. Requires Master (HV-T-BAT-H-58-MASTER-V2 )

    T30

    • X1 – Single Phase: 2, 4 or 6 Triple Power 3.0kWh batteries. Requires BMS (MC0600 & HV10230)
    • X3 – Three Phase: 4, 6, 8 Triple Power 3.0kWh batteries. Requires BMS (MC0600 & HV10230)

    For further configuration information please refer to the installation manual

    BMS Parallel Box II G2 Installation Video

    Please note:

    • Unlike G1 version of BMS-Parallel Box this G2 now requires T58 Master battery, meaning it is easier to retro-fit to existing systems
    • A minimum of 2 batteries (single phase) and 4 batteries (three-phase) must be used with this product.

     

    Supplier Part No:
    SOLAX-BMS-PB-G2
    Weight:
    8.7 kg
    SolaX
    Product form

    Part No: SOLAX-BMS-PB-G2 Storage Systems - Accessory BMS-Parallel Box G2 This BMS is ideal for use with the X1 and X3... Read more

    £599.00 Exc. VAT
    £718.80 Inc. VAT

    • Quality
    • Reliabilty
    • Trusted

    Description

    Part No: SOLAX-BMS-PB-G2 Storage Systems - Accessory

      BMS-Parallel Box G2

      This BMS is ideal for use with the X1 and X3 Hybrid Inverters. It allows you to double the storage capacity with T30 & T58 batteries.

      Features 

      • Increase the capacity of ESS
      • Extend the working hours of ESS
      • Dual-module in case
      • Prolong the batteries life due to the alternate use of dual-module
      • IP55

      T58

      • X1 – Single Phase: 2, 4 or 6 Triple Power 5.8kWh batteries. Requires Master (HV-T-BAT-H-58-MASTER-V2 )
      • X3 – Three Phase: 4, 6, 8 Triple Power 5.8kWh batteries. Requires Master (HV-T-BAT-H-58-MASTER-V2 )

      T30

      • X1 – Single Phase: 2, 4 or 6 Triple Power 3.0kWh batteries. Requires BMS (MC0600 & HV10230)
      • X3 – Three Phase: 4, 6, 8 Triple Power 3.0kWh batteries. Requires BMS (MC0600 & HV10230)

      For further configuration information please refer to the installation manual

      BMS Parallel Box II G2 Installation Video

      Please note:

      • Unlike G1 version of BMS-Parallel Box this G2 now requires T58 Master battery, meaning it is easier to retro-fit to existing systems
      • A minimum of 2 batteries (single phase) and 4 batteries (three-phase) must be used with this product.

       

      Supplier Part No:
      SOLAX-BMS-PB-G2
      Weight:
      8.7 kg
      SolaX

      Forgot Password


      Back to top